Freedom of Information Requests Submitted
We recently submitted the following Requests for Information under the Freedom of Information Act 2000.
Dartford Crossing
- Latest traffic forecasts and analysis of the outputs from the traffic survey carried out in the autumn of 2016, and how this impacts on traffic volume forecasts for 2025 and 2041 published in Tables 4.3 and 4.4 in Volume 5 of the Pre-Consultation Scheme Assessment Report.
- Latest figures on the average number of traffic interruptions per day due to oversize vehicles and hazardous load escorts, together with the average length of time per interruption, and the average length of time traffic is interrupted during a 24 hour period.
- Forecasts of the average number of traffic interruptions per day due to oversize vehicles and hazardous load escorts, and the average length of time traffic is interrupted during a 24 hour period, that will continue to occur after Option C east of Gravesend is built and operational.
LOWER THAMES CROSSING – OPTION A14
- Traffic analysis data, sources, assumptions, calculations, and supporting information used to determine the forecast traffic volumes that would be attracted to and make use of Option A14 (a) per day, and (b) per peak hour.
- Traffic analysis data, sources, assumptions, calculations, and supporting information used to determine how Option A14 would affect traffic volumes using the existing Dartford Crossing and the A282 between junction 2 and junction 30 (a) per day, and (b) per peak hour.
- Data, assumptions, supporting information, and calculations used to determine the cost benefit analysis for this Option A14.
LOWER THAMES CROSSING OPTION C (Route 3)
- Analysis of the outputs from the traffic survey carried out in the autumn of 2016, which included traffic counters and ANPR cameras, and how this impacts on traffic volume forecasts for 2025 and 2041 published in Tables 4.3 and 4.4 in Volume 5 of the Pre-Consultation Scheme Assessment Report.
- Details of the forecast increase in traffic volumes using the (a) A227, (b) A228, and (c) A229 in the event that the above Option C is built, including traffic analysis, data, sources, calculations, and supporting information used to determine the forecast traffic volumes.